Eglinton Crosstown LRT — Tunnel Control Survey
Gyroscopic azimuth control and tunnel alignment verification for 19 km of bored tunnel beneath Eglinton Avenue. Coordinated with TBM crews to maintain sub-centimetre accuracy throughout the drive.
Services Provided