Featured Project: Microtunnel alignment surveys, Dixie-QEW Storm Sewer

Monteith & Sutherland crews work with CRS Tunnelling Canada project team to ensure the microtunnelling of the 1200mm storm sewer at Dixie-QEW is going per design alignment.

Precise traversing, while crawling, bending and crouching, and carrying the survey equipment all the way to the heading in and back to the portal is a very demanding task. Our crews do an outstanding job, delivering excellent surveys data sets, and performing all tasks in a safe manner.

Featured Project: Pre-rehabilitation HDLS survey of overflow sewer

Last month Monteith & Sutherland have teamed-up with PipeFlo and performed pre-rehabilitation high definition laser scanning (HDLS) survey of overflow sewer at Barton Street between Weir St North and Fairfield.

The survey was completed with P40 Leica HDL scanner. The data were processed in Leica Cyclone, and cross-sections at 1 metre interval, along with best fit centreline of the structure, were generated in 3D Reshaper:

Hamilton Barton Overflow HDLS Cross-sections
Hamilton Barton Overflow HDLS Cross-sections

Thanks PipeFlo for the highest safety practices pertaining the confined space entry, and for all the help during the survey.

 

 

 

Featured Project: TTC Subway Survey

Monteith and Sutherland crews worked on a comprehensive survey for the TTC‘s Bloor-Yonge and Pape stations.

Soheil Namdari, pictured above, lead one of the Survey crews completing the control and topographic surveys at Pape Station. The survey crews performed precise traversing and levelling from local City of Toronto control monuments to Pape station. A street-level topopgraphic survey around Pape Station was completed for future planning purposes. We also searched for boundary evidence and completed a cadastral survey to confirm the Pape Station property limits.

At Bloor-Yonge Station project, the crews traversed and levelled from local City of Toronto control monuments to platform level, and then into the tunnels. The control network was then adjusted and used to coordinate the High-Definition Laser Scanning campaign. The challenge of the project has been the time constraints and limited work windows to ensure regular TTC services are not impacted. The use of a HD-scanner was imperative to get big volumes of detailed data as quickly as possible. Our Leica P40 Leica scanner is very quick and of the high precision.


Featured Project: Peel Region Sewer Tunnel Verification

Our crews have been busy assisting Technicore Underground Inc. with verifying the tunnel alignment and ensuring the correctness of the traverse. The survey crews have performed precise traversing from the surface into the tunnel heading.

The long distance to get underground is challenging, and along with varying ambient conditions in the tunnel can cause significant error in the traverse. To mitigate that, and to ensure the highest accuracy of the traverse, our crews used a gyroscopic theodolite, which is one of the few available in Canada. We use a DMT GYROMAT3000, that is the most accurate north-seeking precision-surveying gyroscope in the world. The GYROMAT helps us obtain most accurate azimuths, and thus mitigate accumulative errors in the underground control networks, notably in the long-driven tunnels.

The tunnel being mined is part of the Region of Peel’s East Trunk Sewer twinning to improve wastewater service and allow for growth on the system. The Region of Peel has commissioned the installation of a large sanitary sewer pipe along Erin Mills Parkway, Lincoln Green Way and Lincoln Green Close.

 

 

Complete Geospatial Solutions

From the design of complex geodetic networks through control surveys, gyroscopic verifications, monitoring, hydrographic surveying, detailed topo and HDL Scanning to UAV mapping, at Monteith & Sutherland we have expert personnel and precise equipment to provide trusted results. Monteith & Sutherland: Complete Geospatial Solutions.

 

Tunnel surveying | ECLRT Project

Monteith & Sutherland have been proud partners of Metrolinx, and provide high precision survey services in challenging conditions. In this particular project – performing differential levelling, total station traverses, gyroscopic verification surveys, and High Definition Laser Scanning for our client.

Mill Woods Double Barrel Trunk Sewer Upgrade, Edmonton

Monteith & Sutherland Team is providing tunnel surveying support to CRS-Dibco JV at Mill Woods Double Barrel Trunk Sewer Upgrade Project, Tunnelling Phase, 23 Avenue NW, Edmonton. Our services include precise traversing and TACS guidance system operation, as well as surface settlement monitoring along the tunnelling operations path.

Edmonton_Tunnel_TS

Edmonton_Shaft_TS

Edmonton Launch Shaft

Mid Halton WWTP Effluent Outfall Tunnel Breakthrough

Congratulations to the entire STRABAG team working on the Mid Halton WWTP Effluent Outfall Tunnel.

Yet another accurate and precise breakthrough was made, notably due to tremendous efforts of the project tunnel surveying crew.

At Monteith & Sutherland we are happy to have had contributed to this success by performing numerous gyroscopic surveys, using GYROMAT3000 in order to verify the correctness of the complex underground traverse network spanning over 4 kilometers.

Spot on!

DSC_0443

DSC_0403

***All images are courtesy of STRABAG Canada***